工作职责Responsibilities
1.项目组施工计划接收及分析,审核施工单位的施工计划及人力计划,评估是否可达成项目组施工计划,要求施工单位人力及物力满足项目施工需求,确保项目生产按时完成。
Receiving and analysis of project construction plan, review the construction unit of construction plan and manpower planning, evaluate whether can reach the construction plan of the project, construction unit of human and material resources required to meet project construction requirements, to ensure production completed on time.
2.把控施工单位的进度、质量、环保、安全、文明施工等,对执行不到位的要求及时整改,可根据管理规定进行处罚,并对记录进行书面保存。
Controls the construction progress, quality, environmental protection, safety and civilized construction, timely rectification to the requirement of execution does not reach the designated position, can be punished according to regulations, and the records are written to save.
3.做好施工工序交接及技术交底,确保施工工艺无误。
Do a good job in construction process, transfer and technical clarificaiton, make sure it is construction technology.
4.参照施工计划核对库存情况,对每周/月的施工材料使用做好把控,做好物资需求计划,物资不足需提前申请,保证生产。
Check the inventory with reference to the construction plan, construction materials used for weekly/monthly well control, completes the material requirements planning, material shortage to apply, ensure the production.
5.监督施工单位对材料使用和存储的管理,杜绝浪费降低成本,做到场地规划合理、码放整齐、消防设施齐全,保证物资安全。
Supervision and construction units on the material use and storage management, put an end to waste to reduce cost, achieve the site planning and reasonable, neat pattern, fire control facilities are complete, ensure the safety of the goods.
6.把控现场施工过程,加强施工单位自检管理,确保施工质量达标。
Meet the site construction process, in order to strengthen the management of construction unit self-check, ensure construction quality.
7.根据车间使用计划,对施工进度加强管理,及时检验并协调转运。
According to the workshop use plan, the construction progress to strengthen management, inspection and coordinate transfer in time.
8.检查分包队伍STA、JSA、PTW、PPE的佩戴、火种及非防爆通讯工具的储存,做好日常施工巡查,对不合格区域及时整改。每周组织施工单位负责人进行施工检查,针对问题形成记录,要求施工单位及时整改并反馈。
Check the subcontract team STA, JSA, PTW, PPE wearing, the storage of fire and explosion proof communication tools, daily patrol construction, timely rectification of unqualified area. Conduct construction check, head of the organization construction unit, in view of the problem form records, construction units required rectification and feedback in time.
9.按时提交日报/周报/月报。
Submit daily/weekly/monthly reports on time.
10.负责协调解决分包商的生产需求,风、水、电、车间、工件、物料倒运等资源
Responsible for coordinating to solve the subcontractor\'s production requirements, and the wind, water, electricity, workshop, artifacts, such as material whilst resources
11.负责施工单位工作量的核实和确认
Responsible for the construction unit work of verification and confirmation

任职资格Qualifications
1.大专及以上
College and above
2.涂装及相关类专业知识;
具有涂装施工管理经验,具有防火漆施工管理经验,熟悉油漆施工知识。具有NACE1级或者2级,或防火漆检验证书者优先。

Coating and related knowledge.

Experience in painting construction management, experience in fireproof paint construction management, and familiar with paint construction knowledge. With NACE level 1 or 2, or PFP certificate i
年终奖 定期体检 周末双休 节日礼物 技能培训 管理规范 岗位晋升 免费班车 高温补贴 餐补 交通补贴 加班工资 带薪年假 五险一金

广东省珠海市金湾区高栏港经济区平港路99号

投递简历 和HR聊一下
2024“百职万岗”招聘会
投递有奖!赠送职业成长礼包!
×
温馨提示
经研究,先留言,再投递,企业回复率更高哦
提示 ×

您好,请登录一览职业app或微信小程序查看最新回复进度。可在手机打开m.job1001.com前往页面底部下载app或者前往手机应用市场搜索

×
该职位打招呼次数达到上限,请第二天后再尝试